Standby generators · Generac certified

Whole-Home Generator Installation & Service in Central Texas

Power that starts itself.
Generac and Kohler standby generators — sized to your actual loads, fuel-coordinated, and integrated with your solar or battery.
TECL #35881Licensed & InsuredSPAN Certified10-Year Workmanship Warranty
Sound familiar?

When the grid quits, what’s your plan?

Extension cords and gas cans in the dark isn’t a plan.
A portable generator can’t carry the AC through a Texas summer outage.
You have solar or a battery, but extended outages outlast them.
The generator quote you got skipped the load calculation entirely.
What we install

Sized, fueled, integrated.

We’re Generac Next Generation Standby certified (2026) and install and service Kohler systems too. Sizing starts from your actual loads — the whole house or the circuits that matter.
Fuel coordination (natural gas or propane), automatic transfer switching, permits, and inspection — handled end to end by a licensed electrical contractor.
Already have solar or a battery? A generator completes the picture for extended outages. We design all three to work together, correctly and to code.
Generac standby generator installed by Aether Energy
Generac standby generator installed by Aether Energy
Why it matters

A generator you don’t think about.

Automatic

Starts itself, carries the house, hands back to the grid — no midnight trips outside.

Maintained

Ask about maintenance plans; an unmaintained generator is one that won’t start.

Warrantied

Manufacturer warranty on the unit, 10 years on our installation work.
How it works

What happens after you call.

1

Reach out

Form or phone — reviewed the same business day.
2

Honest assessment

Findings and options in plain English, priced before work starts.
3

Licensed work

On schedule, to code, cleaned up after.
4

Warrantied

10 years on our workmanship, documented per job.
Questions

Asked often.

What size generator do I need?

Sizing follows your loads — whole-home vs essential circuits changes the answer a lot. We calculate it rather than guessing from square footage.

Natural gas or propane?

Whichever your property supports best — we coordinate the fuel side either way.

Can it work with my solar and battery?

Yes, with proper integration — that’s electrical contractor work, and exactly what we do.

How often does it need service?

Annual service plus automatic self-tests keep it start-ready. Our maintenance plans cover it.

How often does a standby generator need service?

Annual service plus its automatic weekly self-test is the baseline; oil, filters, and battery checks keep the start reliable. That’s exactly what our maintenance plans schedule.

Can you service a generator another company installed?

Yes — service and repair on existing standby units is part of the catalog, the same any-installer policy as our solar work.

Why standby

Standby is a different animal.

A portable generator is a chore with a pull cord: fuel runs, extension cords, and somebody home to start it. A standby unit is infrastructure — permanently installed, fed by natural gas or propane, self-starting within seconds of an outage, self-testing weekly. The difference is engineering: a transfer switch that isolates your home from the grid (required for line-worker safety and code), a load calculation that decides between whole-home and essentials coverage, gas supply verified against the unit’s demand, and placement that respects code clearances.

We’re factory-certified on Generac’s current standby line and run the entire path under TECL #35881 — permit, install, inspection, commissioning. And because a generator that hasn’t been serviced is a generator that might not start, every install can roll into a maintenance plan with scheduled exercise checks.

The path

From assessment to first self-test.

The generator path runs: site and load assessment, unit selection, permit, installation, gas coordination, inspection, and commissioning — and it’s worth knowing where the time actually goes. Equipment availability varies by model and season; permits and utility gas coordination run on the city’s and gas provider’s clocks. We manage all of it and give you dates as they firm up rather than promises that won’t survive contact with a permit office.

Install day itself is typically one to two days: pad placement, transfer switch at the panel, fuel connection, then a full commissioning — simulated outage, load verification, and the weekly self-test schedule set before we leave. You get the inspection record, the commissioning results, and the warranty paperwork in writing. From there the unit tests itself weekly, and a maintenance plan keeps the annual service off your to-do list.

Where we do this work

Local, and provably so.

Generator installation in San Antonio — and across the corridor per our service area. Weighing generator against battery? The comparison, honestly.

Ready when you are.

Tell us about your project or the system that needs attention — we’ll take an honest look.