Electrical Panel & Service Upgrades
Your panel is telling you something.
Load calculation first.

Why homeowners call us.
Licensed, not “handy”
Honest scoping
10-year warranty
A clear quote, before work starts.
We quote the full job in writing after we see your panel: a 100A-to-200A service upgrade, a like-for-like main panel replacement, a larger 320A or 400A service, a subpanel, or a SPAN smart panel. The quote spells out the permit, the utility disconnect and reconnect, the equipment and the inspection — no surprise line items.
Federal Pacific, Zinsco and Challenger panels are replaced on the same terms. And if a load calculation shows you do not need an upgrade at all, we tell you that too.
Plan the panel once.
If a charger, a battery or solar is on your list, the panel decision affects all of them. We size the upgrade for what is coming — and on solar homes we check the busbar and interconnection rules before anything is added — so you do not pay for panel work twice.
Want the detail on what drives the price? Read our panel upgrade cost guide.
Local, and provably so.
Panel and service upgrades across our service area — Austin, San Antonio, San Marcos, New Braunfels, Kyle, Buda and the Hill Country. We coordinate the disconnect and reconnect with your utility.
What happens after you call.
Reach out
Honest assessment
Licensed work
Warrantied
Asked often.
How much does a panel upgrade cost?
It depends on your current service, where the panel is, and what your utility requires. You get a fixed, written quote after we see the panel — before any work.
Do I need a 200-amp panel for an EV charger or a battery?
Not always. A load calculation tells us whether your panel has the headroom; load management often makes it work without an upgrade.
Are Federal Pacific and Zinsco panels a problem?
Both brands have documented histories of breakers that can fail to trip. We will inspect yours and tell you plainly, with a replacement quote if you want one.
What is a SPAN panel?
A smart electrical panel that shows and controls every circuit from an app — useful for managing backup power, solar and EV charging.
How long does an upgrade take?
The installation itself is typically a single day. The permit and the utility’s disconnect and reconnect set the overall timeline, and we give you that schedule up front.